Installation and commissioning of control systems and measurement instruments of Persian Gulf water transmission project

  • Capacity: 110,000,000 m3/year
  • Number of I/O signals in the field: 7000
  • Installing and commissioning of measuring instruments
  • Measuring instruments and optical fiber cabling
  • System control technical documents provision
  • Installation and commissioning of central control system
  • Fieldbus networks commissioning
  • Cold/hot commissioning