Installation and commissioning of control systems and measurement instruments of Persian Gulf water transmission project
- Capacity: 110,000,000 m3/year
- Number of I/O signals in the field: 7000
- Installing and commissioning of measuring instruments
- Measuring instruments and optical fiber cabling
- System control technical documents provision
- Installation and commissioning of central control system
- Fieldbus networks commissioning
- Cold/hot commissioning